WP1 Management and Coordination

Duration: M1 – M36  

Objectives

To coordinate the project work towards the achievement of the objectives within the proposed scope and financial resources based on smooth co-operation between the partners.

Deliverables

D1.1 – Quality and Risk Contingency Plan [M3]
D1.2 – Annual Progress Reports [M12, M24, M36]
D1.3 – Final Project Report [M36]

 

 

WP2 Validation requirements and data holdings

Duration: M1 – M7  

Objectives

The main objective of this WP is to ensure the access to the required data and to provide all the necessary specifications for successful testing of the project’s hypothesis.

Deliverables

D2.1 – Pilot requirements and validation criteria [M4]
D2.2 – Data access specification [M6]
D2.3 – System architecture design [M6]
D2.4 – PLACE core server platform [M7]

 

 

WP3 Geospatial context modelling

Duration: M6 – M32  

Objectives

This WP shall focus on the research of information extraction algorithms and their chaining, with the objective to develop a structured context representation extracted from heterogeneous geospatial sensory data.

Deliverables

D3.1 – Feature extraction library [M12]
D3.2 – Feature selection algorithm [M18]
D3.3 – Algorithm for general context establishment and representation [M24]

 

 

WP4 Advanced geospatial predictive analytics

Duration: M12 – M32  

Objectives

The main objective of this WP is to develop new methods for geospatial predictive analytics, capable of capitalising on the structured representation of context.

Deliverables

D4.1 – Context enrichment services [M28]
D4.2 – Geospatial regression models [M30]
D4.3 – Environmental simulation services [M30]
D4.4 – Visual analytics services [M32]

 

 

 

WP5 Component integration and hypothesis testing

Duration: M24 – M36  

Objectives

The core objectives of this WP are:

  • To implement pilot demonstration and, thus, proving TRL 4, and
  • To elaborate on a road map towards its sustainable implementation after the end of the project.

Deliverables

D5.1 Operational system, deployed on testing infrastructure [M32]
D5.2 Operational Performance Verification Report [M34]
D5.3 Service Utility Assessment and Road Map [M36]

 

 

WP6 Dissemination and exploitation

Duration: M1 – M36  

Objectives

This WP is intended to promote the project outcomes in order to create the conditions necessary for a wider uptake and replication of the project outcomes by the scientific community, as well as the industry and end-users.

Deliverables

D6.1 Dissemination and Replication Strategy [M3]
D6.2 Newsletter [one month before each event/milestone – M5, M22, M31, M35]
D6.3 Demonstration facilities [M6, M12, M18, M24, M30, M36]
WP1 WP2       WP6
P h a s e     1
1
            2
            3
            4
            5 MS1
    WP3      
P h a s e     2
6
            7
            8
            9
            10
            11
      WP4     12
            13
            14
            15
            16
            17
            18
            19
            20
            21
            22
            23 MS2
        WP5   24
            25
            26
            27
            28
            29
            30
            31
            32 MS3
           
P h a s e    3
33
            34
            35
            36